Skip to content

Plan B for ARM directly leads to Deimos boulder retrieval mission (DBRM)

December 29, 2014

Plan B for ARM directly leads to Deimos boulder retrieval mission (DBRM)

(A)(1)   ARM boulder retrieval is most extensible to a Deimos boulder retrieval mission

(A)(2)Deimos is Higher in the Mars gravity well so a shorter mission timeline for a SEP

(A)(3) Bring back the Demos boulder to a lunar Lunar DRO

(A)(4) Fly Orion to Deimos boulder DBRM

(B)(1) Deimos boulder retrieval is most responsive to decadal survey needs as  small body solar system evolution (SBAG) and its this that justifies using the SMD budget for 1/3rd  of the mission costs (decadel survey concerns)

(B)(2) DBRM is directly extensible to prepositioning SKYLAB-II(2) at Deimos after  prepositioning SKYLAB-II(1) at EML-1

Jon Goff suggests the same sort of sort of idea here a talking point # 4 . Jon talks science with ARM at Phobos and Deimos  and this is precisely what the decadal survey is looking for with its SBAG committee.Jon speaks of ISRU from Martian moons a great idea!   http://forum.nasaspaceflight.com/index.php?topic=32060.180

seeking Mentor Protege

Veteran small business set aside

Steven Torry Rappolee
Terrestrial & Cislunar Exploration technologies
A Post 9/11 Veteran owned concern
810 334 4374
Fax 810 449 5484
UM Flint Student Business Incubator, #207
423 North Saginaw Street,Flint, Michigan, 48502

Leave a comment